Cold-chain records: what applies today and what the EU proposes
A distributor investigating a temperature excursion has a reason to connect monitoring and shipment records today. That reason comes from existing distribution practice. The European Commission’s proposed changes to manufacturing guidance have a different scope and timetable.
Frigalis Published
Distribution: the record behind a notification
Section 9.2 of the EU good distribution practice (GDP) guidelines for human medicines calls for transport deviations, including temperature excursions, to be reported to the distributor and the recipient concerned. It also calls for a procedure for investigating and handling excursions. A logger can show when the temperature crossed a limit. It cannot, on its own, show which delivery was involved or who was notified.
Manufacturing: a closed consultation is not an effective date
As of 19 November 2026, the Commission’s EudraLex Volume 4 index lists the January 2011 texts for GMP Chapter 4 (Documentation) and Annex 11 (Computerised Systems). The consultation on their revision ran from 7 July to 7 October 2025. The draft chapter addresses electronic records; the draft annex gives greater attention to audit trails and data integrity. A separate draft Annex 22 covers artificial intelligence.
These are proposals for manufacturing guidance. Closing the consultation did not amend the GDP guidelines or set a date for distributors to replace spreadsheets.
A pilot built around one closed shipment
Frigalis proposes a retrospective comparison using records the pilot site authorises. For the same excursion, the team retrieves the logger history, the dispatch reference and the record of notification first through its usual process, then through the pilot workflow. A second reviewer checks the links back to source and flags missing evidence. Preparation time is meaningful only if the file remains at least as complete. The site retains responsibility for the quality decision.
The investment question: does the saving recur?
A shorter review at one site is a starting point. The commercial case depends on how often such reviews occur, how much work the software removes and what it costs to connect the next site. Those are questions a pilot can answer without assuming that draft rules will force a purchase.
